Olara Residences
1919 N Flagler Drive, West Palm Beach, FL 33407
West Palm Beach's largest active waterfront condo development — twin 26-story towers on a 4-acre Intracoastal site.
- 4-acre Intracoastal-facing site on N Flagler Drive
- 275 condos + 170 apartments + 30,000 sqft retail
- 80,000 sqft of 6th-floor amenity deck
- Restaurant by Michelin-starred Chef José Andrés
- Architecture by Arquitectonica · Interiors by Gabellini Sheppard
- Two pools (lap + leisure)
- Regulation fitness center
- Michelin-starred restaurant (Chef José Andrés)
- Spa, treatment rooms, sauna
- Co-working and meeting suites
- Private dining + event spaces
- Children's club and play zone
- 30,000 sqft of ground-floor retail
- 24-hour concierge + valet
- Multi-level parking with EV charging
Want pricing + floor plans?
Olara Residences sales gallery access is not open to the public. We coordinate introductions, current floor-plan availability, pricing, and developer incentives (rate buydowns, credits, closing concessions) directly with the sales team.
Living in Olara: what to know before you buy
A 275-residence waterfront tower on North Flagler Drive that is still about two years out: completion is now 2028, after earlier targets of 2026 and 2027.
Olara is a condominium by the New York developer Savanna at 1919 North Flagler Drive, just north of the Flagler Memorial Bridge beside Currie Park. Arquitectonica designed the building and Gabellini Sheppard the interiors. It will have about 275 residences with two to four bedrooms, from roughly 1,500 to more than 4,200 square feet, and the developer's site prices them from $2 million. A second tower of rental apartments was approved on the same site.
The timeline is the first thing to weigh. Sales launched in January 2023, when completion was expected in early 2026. Vertical construction began in December 2025, and the developer now gives a topping-off in spring 2027 and completion in 2028. The earliest buyers will have waited about five years.
The amenity list is long — more than 80,000 square feet, including a 13,000-square-foot fitness center, a spa, lap and leisure pools, a waterfront restaurant by José Andrés Group that is open to the public, and a private dock extending 192 feet into the Intracoastal. The developer's own legal notice calls the plans conceptual and subject to change, and the number of boat slips described has differed from one announcement to the next.
It suits you if you want
- Buyers who want a new full-service building on the West Palm Beach waterfront and can wait until 2028
- A lower entry price than the new towers on South Flagler Drive
- People who will use a serious gym, spa and on-site restaurant
Think twice about
- Your deposit is committed until 2028 at the earliest. Ask for the deposit schedule and when each payment stops being refundable.
- The completion date has moved three times. Ask what the contract gives you if it moves again.
- If a slip matters, get the slip — its size, price and terms — written into the contract.
- A rental tower and a public restaurant share the site; it is not a private enclave.
- Monthly fees quoted before a building opens are estimates. Ask for the proposed budget.
Want the version we would tell a client? Which streets, which lots, and what we would walk away from. Ask us about Olara.
Ask about OlaraBy Nicolas Diaz, Broker, XI Realty. Facts checked November 2026 against: Olara West Palm Beach; Olara — lifestyle and amenities; Olara — legal notice; Olara press release, Dec 12 2025 — vertical construction begins; Palm Beach Post, Dec 27 2022 — planning board approval. Prices and listing counts on this page come from the MLS. Zoning, fees and rules change; verify them for the specific property.