Olara Residences
1919 N Flagler Drive, West Palm Beach, FL 33407
Checked Nov 23, 2026 against public sources · completion dates are the developer's targets
Renderings courtesy of Olara / Savanna · source · artist's conceptions; the finished building may differ.
- Developer
- Savanna
- Architect
- Arquitectonica
- Interior Designer
- Gabellini Sheppard Associates
- Bedrooms
- 2-4 BR + den
- Size Range
- approximately 1,500 sqft to over 4,200 sqft
- Property Type
- Condo
- Location
- West Palm Beach
Savanna's twin towers on a 4-acre North Flagler Drive site — 275 condominiums in a 26-story tower plus rentals.
Highlights
- 4-acre Intracoastal-facing site on N Flagler Drive
- 275 condos + 170 apartments + 30,000 sqft retail
- 80,000 sqft of 6th-floor amenity deck
- Restaurant by Michelin-starred Chef José Andrés
- Architecture by Arquitectonica · Interiors by Gabellini Sheppard
Completion target over time
- 2026 — target at the 2023 sales launch
- 2028 — developer target since late 2025 (topping-off spring 2027)
Amenities (as marketed by the developer)
- Two pools (lap + leisure)
- Regulation fitness center
- Michelin-starred restaurant (Chef José Andrés)
- Spa, treatment rooms, sauna
- Co-working and meeting suites
- Private dining + event spaces
- Children's club and play zone
- 30,000 sqft of ground-floor retail
- 24-hour concierge + valet
- Multi-level parking with EV charging
Before you put down a deposit
- Ask for the deposit schedule in writing and where deposits are held (Florida law requires escrow; above 10% of the price, the developer may use funds for construction only if the contract says so).
- Read the condominium documents during the statutory review window before your contract becomes binding.
- Ask what happens if completion slips past the outside date in the contract.
- Compare the asking price with resales nearby — our buyer guides explain how.
XI Realty's general guidance, not legal advice.
Sources
Get the Olara Residences price sheet
We request current availability, the price sheet and the deposit schedule from the sales team and send them to you, with our read on how it compares.
11 residences available · $2.42M–$8.99M
Residence-level availability from the sources below, each dated. Availability moves quickly in pre-construction — confirm a residence with us before you plan around it.
Residences listed on the MLS
As of Nov 24, 2026
| Residence | Beds / baths | Interior sq ft | List price | Status |
|---|---|---|---|---|
| 208 | 2 / 3 | 3,402 | $5.67M | Available |
| 309 | 4 / 5 | 4,228 | $6.18M | Available |
| 701 | 2 / 3 | 1,741 | $1.88M | Under contract |
| 702 | 2 / 3 | 1,857 | $1.95M | Under contract |
| 706 | 2 / 3 | 1,483 | $1.63M | Under contract |
| 710 | 3 / 4 | 2,965 | $5.08M | Available |
| 714 | 4 / 5 | 4,110 | $6.75M | Under contract |
| 806 | 2 / 3 | 1,483 | $1.77M | Under contract |
| 813 | 4 / 5 | 3,805 | $6.59M | Under contract |
| 814 | 4 / 5 | 4,110 | $6.9M | Under contract |
| 1014 | 4 / 5 | 4,097 | $7.99M | Under contract |
| 1102 | 2 / 3 | 1,857 | $2.6M | Under contract |
| 1106 | 2 / 3 | 1,483 | $1.95M | Under contract |
| 1112 | 2 / 3 | 1,914 | $2.43M | Under contract |
| 1202 | 2 / 3 | 1,857 | $2.64M | Under contract |
| 1408 | 2 / 3 | 1,908 | $2.42M | Available |
| 1505 | 3 / 4 | 2,489 | $3.38M | Under contract |
| 1710 | 3 / 4 | 2,965 | $5.74M | Under contract |
| 1805 | 3 / 4 | 2,489 | $3.75M | Available |
| 1814 | 4 / 5 | 4,110 | $8.99M | Available |
| 1907 | 3 / 4 | 2,378 | $2.75M | Under contract |
| 1909 | 3 / 4 | 2,656 | $3.85M | Under contract |
| 1910 | 3 / 4 | 3,034 | $4.55M | Available |
| 1911 | 4 / 5 | 3,805 | $8.81M | Available |
| 2001 | 3 / 4 | 2,999 | $4.3M | Available |
| 2002 | 3 / 4 | 2,583 | $3.93M | Under contract |
| 2006 | 2 / 3 | 1,774 | $4.7M | Under contract |
| 2007 | 3 / 4 | 2,378 | $2.87M | Available |
| 2009 | 3 / 4 | 2,656 | $4.2M | Available |
| 2010 | 3 / 4 | 3,035 | $4.74M | Under contract |
Residences in this building currently on the MLS — listed by the developer's sales office or resold by buyers before closing. Each links to its listing. The developer's full availability is usually larger; ask us for the sales team's list.
Published on the developer's website
As of Nov 25, 2026
Floor plans
| Plan | Lines | Beds / baths | Interior sq ft | Terrace sq ft | Plan drawing |
|---|---|---|---|---|---|
| A | — | 2 + den / 2.5 | 1,857 | 466 | View plan |
| B | — | 2 + den / 2.5 | 1,983 | 431 | View plan |
| C | — | 3 + den / 3.5 | 3,286 | 1,225 | View plan |
| D | — | 2 + den / 2.5 | 1,774 | 381 | View plan |
| E | — | 3 + den / 3.5 | 2,963 | 605 | View plan |
| F | — | 4 + den / 4.5 | 3,805 | 793 | View plan |
| G | — | 4 + den / 4.5 | 4,110 | 599 | View plan |
| H | — | 2 + den / 2.5 | 1,914 | 362 | View plan |
| I | — | 3 / 3.5 | 2,358 | 922 | View plan |
| J | — | 2 + den / 2.5 | 1,887 | 576 | View plan |
| K | — | 2 + den / 2.5 | 1,908 | 376 | View plan |
| L | — | 2 / 2.5 | 1,483 | 354 | View plan |
| M | — | 3 / 3.5 | 2,489 | 750 | View plan |
| N | — | 2 / 2.5 | 1,741 | 381 | View plan |
| O | — | 3 + den / 3.5 | 3,034 | 565 | View plan |
| P | — | 3 / 3.5 | 2,656 | 1,196 | View plan |
| Q | — | 3 / 3.5 | 2,378 | 546 | View plan |
| T | — | 3 / 3.5 | 2,999 | 723 | View plan |
| U | — | 3 + den / 3.5 | 2,578 | 584 | View plan |
| V | units 401, 501 (from PDF filename) | 3 + den / 3.5 | 3,008 | 1,110 | View plan |
| W | units 402, 502 (from PDF filename) | 2 + den / 2.5 | 2,498 | 540 | View plan |
| X | units 207, 307, 403, 503 (from PDF filename) | 4 + den / 4.5 | 4,038 | 1,340 | View plan |
| Y-208 | unit 208 | 2 + den / 2.5 | 3,402 | 1,809 | View plan |
| Y-308,404,504 | units 308, 404, 504 | 2 + den / 2.5 | 3,552 | 440 | View plan |
| Z-209 | unit 209 | 4 + den / 4.5 | 4,015 | 1,674 | View plan |
| Z-309,405,505 | units 309, 405, 505 | 4 + den / 4.5 | 4,228 | 602 | View plan |
Published on the developer's own website on that date; plan drawings link to the developer's site.
Living in Olara: what to know before you buy
A 275-residence waterfront tower on North Flagler Drive that is still about two years out: completion is now 2028, after earlier targets of 2026 and 2027.
Olara is a condominium by the New York developer Savanna at 1919 North Flagler Drive, on the Intracoastal just south of Currie Park, north of downtown. Arquitectonica designed the building and Gabellini Sheppard the interiors. It will have about 275 residences with two to four bedrooms, from roughly 1,500 to more than 4,200 square feet, and the developer's site prices them from $2 million. A second tower of rental apartments was approved on the same site.
The timeline is the first thing to weigh. Sales launched in January 2023, and completion was then expected in 2026. Vertical construction began in December 2025, and the developer now gives a topping-off in spring 2027 and completion in 2028. The earliest buyers will have waited about five years.
The amenity list is long — more than 80,000 square feet, including 13,000 square feet of indoor and outdoor fitness space, a spa, lap and leisure pools, a waterfront restaurant by José Andrés Group that was announced as open to the public, and a private dock extending 192 feet into the Intracoastal. The developer's own legal notice calls the plans conceptual and subject to change, and the number of boat slips described has differed from one announcement to the next.
It suits you if you want
- Buyers who want a new full-service building on the West Palm Beach waterfront and can wait until 2028
- A lower entry price than the new towers on South Flagler Drive
- People who will use a serious gym, spa and on-site restaurant
Think twice about
- Your deposit is committed until 2028 at the earliest. Ask for the deposit schedule and when each payment stops being refundable.
- The completion date has moved twice. Ask what the contract gives you if it moves again.
- If a slip matters, get the slip — its size, price and terms — written into the contract.
- A rental tower and a public restaurant share the site; it is not a private enclave.
- Monthly fees quoted before a building opens are estimates. Ask for the proposed budget.
Want the version we would tell a client? Which streets, which lots, and what we would walk away from. Ask us about Olara.
Ask about OlaraCompiled by XI Realty from the public sources below; broker review pending. Facts checked November 2026 against: Olara West Palm Beach; Olara — lifestyle and amenities; Olara — legal notice; Olara press release, Dec 12 2025 — vertical construction begins; Savanna, Jan 2023 — sales launch and approved rental tower; Savanna — towers proposed on the waterfront south of Currie Park; Profile Miami, Feb 23 2024 — private dock, 192 feet, 2026 completion; Florida YIMBY, Mar 2024 — José Andrés Group restaurant; Behind the Hedges — Olara dock and slip count. Prices and listing counts on this page come from the MLS. Zoning, fees and rules change; verify them for the specific property.
Frequently asked questions about Olara Residences
When will Olara in West Palm Beach be finished?
How much do residences at Olara cost?
Who is developing Olara?
Does Olara have a marina?
Where is Olara?
How much do residences at Olara Residences cost?
When will Olara Residences be completed?
Who is developing Olara Residences?
How many residences will Olara Residences have?
How do I get pricing and floor plans for Olara Residences?
More pre-construction in West Palm Beach
Courtesy of Alba Palm BeachAlba Palm Beach
West Palm Beach · Completed June 2026
Completed June 2026 — 22-story Intracoastal-front condo on North Flagler Drive, 55 residences plus townhomes.
Project details
Courtesy of Banyan Tree Residences West Palm BeachBanyan Tree Residences West Palm Beach
West Palm Beach · Est. 2029
88 residences by Mast Capital + Curated JCZM Development + Banyan Group in West Palm Beach. Announced; completion Est. 2029.
Project details
Courtesy of Related RossEdgeworth
West Palm Beach · Est. 2029
168 residences by Related Ross in West Palm Beach. Selling Pre-Construction; completion Est. 2029.
Project details