Buying new construction and pre-construction in South Florida

Buying from a builder or developer is a different transaction from buying a resale. The seller writes the contract, the home may not exist yet, your deposit can sit with the developer for years, and the law that protects you depends on whether you are buying a condominium or a house.

This guide walks through the Florida rules that apply to new construction and pre-construction purchases in Palm Beach, Broward, Miami-Dade, Martin and St. Lucie counties, with the statute behind each one.

By XI RealtyPublished November 27, 2026Facts checked as of November 2026
In short
  • Condo deposits up to 10% of the price must go into escrow with an independent agent (s. 718.202).
  • Above 10%, the developer may spend deposits on construction only after construction begins and only if the contract says so, in a boldface legend.
  • You can void a developer condo contract within 15 days of signing and receiving the documents (s. 718.503). The right ends at closing.
  • New condos carry statutory implied warranties (s. 718.203). Read the builder's written warranty for a house: it is a contract term.
  • Defect claims start with a written chapter 558 notice, at least 60 days before suit.
  • A home not substantially complete on January 1 is not assessed for that year (s. 192.042). Budget for the jump.

1. New construction, pre-construction and spec homes

The words get used loosely. For a buyer they describe different risks:

TermWhat it usually meansWhat you are relying on
Pre-construction (condo)You sign with the developer before the building is built or finished, often from a sales gallery and floor plans. Closing happens after completion.The developer's disclosures, the escrow rules for your deposit, and the developer's ability to finish on the timeline in the contract.
New construction (house or townhome)A builder sells a home in a new community, either built to order on a lot you choose or already under way.The builder's contract, its written warranty, and inspections during and after construction.
Spec homeA home the builder starts or finishes before it has a buyer, then sells as available inventory.What you can inspect now, since much of the work may already be covered by drywall.

The Florida Condominium Act (chapter 718) has specific rules for developer sales of condominium units: deposits, disclosures, cancellation rights and warranties. A single-family house in a new community is generally governed by the builder's contract instead, plus any community association, community development district and local rules. The sections below say which is which.

2. Condo deposits: escrow and the 10% rule

Section 718.202, Florida Statutes, governs deposits a condominium developer takes before closing when the property has not been substantially completed:

RuleWhat the statute says
Up to 10% of the priceMust be paid into an escrow account. The escrow agent gives you a receipt on request. The division director may accept other assurances, such as a surety bond or irrevocable letter of credit, for residential condominiums (s. 718.202(1)).
Above 10%, before completionMust be held in a special escrow account controlled by the escrow agent and may not be used by the developer before closing, except as subsection (3) allows or to refund you (s. 718.202(2)).
Use for constructionOnly if the contract provides for it, and only once construction of the improvements has begun, for actual construction and development costs. Not for sales commissions, advertising, loan costs, attorney or accounting fees, or insurance. The contract must carry, in boldface on the first page and above your signature: "Any payment in excess of 10 percent of the purchase price made to developer prior to closing pursuant to this contract may be used for construction purposes by the developer" (s. 718.202(3)).
Who can hold escrowA bank, savings and loan, Florida Bar attorney, real estate broker registered under chapter 475, a title insurer acting through its employees or a licensed title agent, or a lending institution with net worth over $5 million. The escrow agent must be independent of the developer (s. 718.202(8)).
Reservation depositsA reservation (before a purchase contract) must also go into escrow and must be refunded in full on written request. Once you sign a purchase contract, it becomes subject to the regular deposit rules (s. 718.202(6)).
If the developer does not complyThe contract becomes voidable by the buyer, with a refund of all sums deposited plus interest (s. 718.202(5)). Willful failure to escrow is a third-degree felony (s. 718.202(7)).

"Completion of construction" for these purposes means a certificate of occupancy for the entire building, or the local equivalent (s. 718.202(4)). In practice, the question to ask on any project is the same: what is the deposit schedule, who is the escrow agent, and does the contract contain the construction-use legend? The contract itself must name the escrow agent and its address (s. 718.503(1)(a)7.).

3. Your 15-day right to cancel a developer condo contract

Under s. 718.503(1), a contract to buy a residential condominium unit from the developer must state, in conspicuous type, that it is voidable by the buyer:

  • by written notice within 15 days after you sign it and receive all of the items the developer must deliver; and
  • by written notice within 15 days after you receive any amendment that materially alters or modifies the offering in a way that is adverse to you.

Any purported waiver of these rights has no effect, and the right ends at closing. The same legend says that the developer's budget figures are estimates, and that actual costs exceeding them are not, on their own, a material adverse change. The developer may not close for 15 days after you sign and receive the documents unless you are told about the voidability period and agree in writing to close earlier.

What the developer must hand you

The prospectus or offering circular with its exhibits, where s. 718.504 applies, or the applicable documents listed in s. 718.503(1)(b), which include the declaration of condominium, the association's articles and bylaws, the estimated operating budget and schedule of expenses for each unit type, management and other contracts, the floor plan and plot plan, and covenants and restrictions. Since the building-safety laws, the list also includes the milestone inspection summary, the most recent structural integrity reserve study and the turnover inspection report, or a conspicuous statement that each has not been completed or is not required.

Two other required statements

The developer's contract must also carry the caveat that oral representations cannot be relied on, and a flood statement: that homeowners' policies do not cover flood, and whether the developer knows of flooding that damaged the property, filed a flood claim or received flood-damage assistance during its ownership (s. 718.503(1)(a)2. and 9.). If a salesperson told you something that matters, get it into the contract.

4. Developer contracts vs. the FR/BAR forms

Most South Florida resales are written on the Florida Realtors/Florida Bar forms, such as the AS IS Residential Contract, with standard riders (see the Florida Realtors form descriptions). Builders and condominium developers usually use their own contract instead, drafted by their own counsel. That changes what you can assume:

  • No standard inspection period. The AS IS form's inspection period and open cancellation right exist because that form provides them. A builder contract has only the rights it writes in, plus any the law adds, such as the 15-day condo right above.
  • Completion dates. Look for the estimated completion date, any outside date, what extends it, and what you can do if it passes.
  • Deposits and default. When deposits are due, when they become non-refundable, and what the developer keeps if you cannot close.
  • Changes. Whether the developer may substitute materials, change floor plans or amenities, and how that interacts with your right to cancel on a material adverse amendment.
  • Financing. Whether the contract is contingent on your loan, and whether you must use a particular lender or closing agent to get an incentive.
  • Disputes. Arbitration or mediation clauses, venue, and the chapter 558 notice.
  • District and association costs. In a community development district, an initial-sale contract must carry a boldface disclosure that the district may levy taxes or assessments on top of county taxes (s. 190.048).

Because the developer wrote the contract, have a Florida real estate attorney review it before you sign or inside any cancellation window. Your agent can request the project documents and compare terms across projects; an attorney can tell you what the terms mean for you.

5. Warranties: statutory for condos, contractual for houses

New condominiums (s. 718.203)

The developer is deemed to grant each unit purchaser implied warranties of fitness and merchantability:

WhatWarranty period
The unit3 years from completion of the building containing the unit.
Roof, structure, and mechanical, electrical and plumbing elements serving the building (except mechanical elements serving only one unit)3 years from completion, or 1 year after owners other than the developer obtain control of the association, whichever is later, but no more than 5 years.
Other improvements for the use of unit owners3 years from completion of the improvements.
Personal property transferred with the unitSame period as the manufacturer's warranty, from closing or possession, whichever is earlier.
All other property conveyed with the unit1 year to the initial purchaser from closing or possession, whichever is first.

The contractor, subcontractors and suppliers also grant implied warranties: 3 years from completion for the roof, structure and mechanical and plumbing elements serving the building, and 1 year after completion of all construction for other work. "Completion" means a certificate of occupancy, temporary or otherwise, for the entire building or improvement. The warranties are conditioned on routine maintenance and pass to each owner's successors (s. 718.203(2)-(5)).

New houses and townhomes

For a house, read the builder's written warranty as part of the contract: what it covers, for how long, how to make a claim, and what it excludes or disclaims. Ask whether any part is backed by a third-party warranty company. We do not summarize Florida's common-law warranty rules for houses here; if a warranty question matters to your decision, ask a Florida attorney.

6. Construction defects: the chapter 558 process

Before suing over a construction defect, Florida requires notice and a chance to repair. Contracts for improvement of real property must contain a notice that construction-defect claims are subject to the notice and cure provisions of chapter 558, unless the parties agree it does not apply (s. 558.005(6)). The main steps under s. 558.004:

StepDeadlineAssociation of more than 20 parcels
Claimant serves written notice of claim describing each defect and its locationAt least 60 days before filing suitAt least 120 days
Recipient may inspect the propertyWithin 30 days of the noticeWithin 50 days
Recipient may forward the notice to subcontractors, suppliers or design professionalsWithin 10 daysWithin 30 days
Recipient serves a written responseWithin 45 days of the noticeWithin 75 days

The response must offer to repair at no cost, offer to pay, offer a combination, dispute the claim, or say the insurer will decide on payment within 30 days. If the recipient disputes the claim or does not respond in time, the claimant may file suit without further notice. The claimant should try to serve notice within 15 days of discovering a defect, though missing that does not by itself bar a suit, and a notice of claim does not toll a statute of repose (s. 558.004(1)(c)-(d)). Deadlines here are strict; talk to a lawyer before you serve or answer one.

7. Inspections on a new home

New does not mean inspected for you. An inspector you hire works for you, not for the builder. Buyers commonly use three visits:

  1. Pre-drywall. After framing, roofing, windows and rough plumbing, electrical and mechanical are in, before insulation and drywall cover them. This is the only time much of that work is visible.
  2. Final (pre-closing). Before the walkthrough and closing, to build the punch list while the builder still has your closing to motivate repairs.
  3. Before the warranty ends. Where the builder's warranty runs a year, a visit shortly before it expires (often called an 11-month inspection) catches items to submit while they are still covered.

Check the contract before you schedule: some builders limit when and how outside inspectors can enter the site. On a condominium, your access to the unit before closing depends on the developer's contract, and the building's common elements are the association's concern; the turnover inspection report described below is the document to read.

8. Post-Surfside condo safety rules, as they apply to new buildings

After the Champlain Towers South collapse, the Legislature passed SB 4-D (2022, chapter 2022-269), which created mandatory milestone inspections. Be precise about what reaches a new building:

  • Milestone inspections are for aging buildings. Under s. 553.899(3), residential condominium and cooperative buildings three habitable stories or more need one by December 31 of the year the building reaches 30 years from its certificate of occupancy (25 if the local enforcement agency requires it), then every 10 years. A new building will not need one for decades.
  • The turnover inspection report applies regardless of age or height. When unit owners other than the developer elect a majority of the board, the developer must turn over control and deliver records, including a sealed turnover inspection report on the roof, structure, fireproofing and fire protection, plumbing, electrical, waterproofing and exterior painting, windows and exterior doors, and on items such as elevators, HVAC, pools, seawalls, paving, drainage and irrigation (s. 718.301(4)(p)-(q)).
  • When turnover happens. Owners other than the developer may elect at least a third of the board once they own 15% of the units, and a majority on the first of several events, including three years after 50% of the units are conveyed or three months after 90% are conveyed (s. 718.301(1)).
  • Disclosure in your contract. The developer must give you the milestone summary, the most recent structural integrity reserve study and the turnover inspection report, or a conspicuous statement that each has not been completed or is not required (s. 718.503(1)(b)18.-20.).

For how reserves, structural integrity reserve studies and special assessments work once a building is owner-run, see our Florida condo due diligence guide.

9. Property tax on a new home

Florida assesses real property at just value as of January 1 each year, and an improvement that is not substantially completed on January 1 has no value placed on it for that year. "Substantially completed" means the improvement, or a self-sufficient unit within it, can be used for its intended purpose (s. 192.042(1)).

  • The first bill can be land only. If the house was still under construction on January 1, that year's assessment can reflect the lot alone, and a listing or closing statement built on it will understate what you will pay.
  • The next bill includes the house. The first January 1 after completion, the home is assessed, often at a much higher figure.
  • Homestead is your filing, not the builder's. You must hold title and make the home your permanent residence on January 1, and file with the county property appraiser by March 1 (s. 196.011). Closing in, say, February means you cannot claim homestead until the following year.
  • District assessments are extra. In a community development district, the district's taxes or assessments are on top of county taxes (s. 190.048).

Our Florida property tax after purchase guide explains homestead, Save Our Homes, portability and the 2027 Amendment 3 changes, with each county's estimator. Estimate your bill on the finished home, not on the land-only bill.

10. Flood and insurance

New does not mean outside the flood zone. Look up the lot's FEMA zone, ask for the elevation certificate when the home is complete, and get flood and wind quotes before your deposits become non-refundable. On a developer condo, the contract's flood statement (s. 718.503(1)(a)9.) tells you what the developer knows about past flooding on the property.

Our South Florida flood zones guide covers the zones, base flood elevation, the elevation certificate and NFIP vs. private flood coverage.

11. What our pre-construction and new construction pages track

Our South Florida pre-construction directory lists the projects we track in Palm Beach, Broward, Miami-Dade and St. Lucie counties. For each project it shows the status (selling pre-construction, under construction, announced or recently delivered), the developer, the starting price the developer has published, the target completion, the number of residences and stories, the property type and the city, with the date the record was last checked. You can filter by county, city, status, property type, starting price, completion year and developer, and compare projects side by side.

The figures are the developer's published figures as of the date shown, and completion dates are targets, not promises. Where a project page has a history of its completion target, it shows how that target has moved. Announced projects are labelled as announced, not as selling.

For houses and townhomes, new construction homes for sale lists MLS listings marked as new construction across the five counties, and our Palm Beach County new construction ranking is built from closed MLS sales.

Before you sign with a builder or developer

  1. Get the full contract and every exhibit before you sign, and have a Florida real estate attorney review it.
  2. On a condo, confirm the escrow agent's name and address in the contract, the deposit schedule, and whether the 10% construction-use legend appears.
  3. Calendar the 15-day cancellation window from the later of signing and receiving all documents, and read the documents inside it.
  4. Note the estimated completion date, the outside date, and your remedies if it passes.
  5. Read the warranty: the statutory periods on a condo, the builder's written warranty on a house.
  6. Schedule pre-drywall, final and pre-warranty-expiry inspections if the contract allows them.
  7. Estimate property tax on the finished home, plus any CDD and association assessments, and plan your homestead filing.
  8. Check the flood zone and get flood and wind insurance quotes.
  9. Get anything a salesperson promised in writing, in the contract.
Before you sign

Tell us which projects you are weighing.

Send us the projects or communities. We will request the current price sheet, deposit schedule and project documents from the sales team, and tell you what to look for in the contract and which inspections to line up.

Browse the pre-construction directory or new construction homes for sale.

Ask about a new build

Name, email and phone. A broker replies within one business day.

Private · never shared or sold

By submitting, you agree that XI Realty may contact you about your request by phone or email. We text you only if you check the box above. Privacy Policy.

General information, not advice

This is general information, not legal, tax or insurance advice. Laws, rates and forms change, and how they apply depends on the property and on you. Confirm anything you rely on with your real estate attorney, CPA, insurance agent or the county property appraiser.

Sources

As of November 2026 · primary sources checked November 27, 2026

  1. Fla. Stat. § 718.202 — Sales or reservation deposits prior to closing (escrow, the 10% threshold, use of deposits for construction)
  2. Fla. Stat. § 718.503 — Developer disclosure prior to sale; 15-day voidability; documents the developer must deliver
  3. Fla. Stat. § 718.203 — Warranties (developer, contractor, subcontractor and supplier implied warranties)
  4. Fla. Stat. § 718.301 — Transfer of association control; turnover inspection report
  5. Fla. Stat. § 553.899 — Mandatory structural (milestone) inspections for condominium and cooperative buildings
  6. SB 4-D (2022 Special Session D), Building Safety, ch. 2022-269
  7. Fla. Stat. § 558.004 — Construction defects: notice and opportunity to repair
  8. Fla. Stat. § 558.005 — Construction defects: contract provisions and required contract notice
  9. Fla. Stat. § 192.042 — Date of assessment (improvements not substantially completed on January 1)
  10. Fla. Stat. § 196.011 — Annual application for exemption (March 1 deadline)
  11. Fla. Stat. § 190.048 — Community development district disclosure in initial-sale contracts
  12. Florida Realtors — Form descriptions (FR/BAR contracts and riders)
  13. Florida Realtors/Florida Bar “AS IS” Residential Contract (ASIS-7x)
New construction · questions

Buying new construction in South Florida: questions buyers ask

Is my pre-construction condo deposit protected in Florida?
Section 718.202, Florida Statutes, requires a developer selling a condominium unit before construction is substantially complete to put buyer payments up to 10 percent of the sale price into an escrow account with an independent escrow agent, such as a bank, a Florida Bar attorney, a licensed real estate broker or a title insurer. Payments above 10 percent received before completion go into a special escrow account, and the developer may use them for actual construction costs only after construction has begun and only if the contract allows it, in which case the contract must carry a boldface legend saying so on the first page and above your signature.
Can I cancel a new condo contract with a developer in Florida?
Yes, within a limited window. Under s. 718.503(1), a contract to buy a residential condominium unit from the developer is voidable by written notice within 15 days after you sign it and receive all of the documents the developer must deliver, and again within 15 days after you receive an amendment that materially alters the offering in a way that is adverse to you. A waiver of these rights has no effect, and the right ends at closing. The statute says budget figures are estimates and that higher actual costs are not, by themselves, a material adverse change.
What warranties come with a new condo in Florida?
Section 718.203 deems the developer to grant each unit purchaser implied warranties of fitness and merchantability: 3 years on the unit from completion of the building; for the roof, structure and mechanical, electrical and plumbing elements serving the building, 3 years from completion or 1 year after owners other than the developer take control of the association, whichever is later, but no more than 5 years; and other periods for personal property and other improvements. The contractor, subcontractors and suppliers also grant warranties. They are conditioned on routine maintenance and pass to later owners.
What do I have to do before suing a builder for a construction defect in Florida?
Chapter 558 requires written notice first. Under s. 558.004, the claimant must serve a written notice of claim at least 60 days before filing suit (120 days for an association representing more than 20 parcels), describing each defect in reasonable detail. The builder may inspect, and must respond in writing within 45 days (75 days for such an association) with an offer to repair, an offer to pay, a combination, a statement disputing the claim, or a statement that its insurer will decide on payment. If it disputes the claim or does not respond, the claimant may proceed.
Why is the first property tax bill on a new home so low?
Florida assesses real property as of January 1, and under s. 192.042 an improvement that is not substantially completed on January 1 has no value placed on it for that year. If a home was still under construction on January 1, that year's bill can reflect the land alone. The next January 1 after completion, the house is assessed, and the bill can rise sharply. To claim homestead you must own the home and use it as your permanent residence on January 1, and file by March 1 (s. 196.011).
Do milestone inspections apply to a brand-new condo building?
Not at first. Section 553.899 requires a milestone inspection for residential condominium and cooperative buildings three habitable stories or more by December 31 of the year the building reaches 30 years from its certificate of occupancy (25 if the local agency requires it), then every 10 years. A new building will not need one for decades. What applies to new condominiums is the developer's turnover inspection report at the handover of control (s. 718.301(4)(p)-(q)), and the developer's disclosure of whether milestone, turnover or reserve-study items exist (s. 718.503).